Precautions for installing wooden floor
1. Ground flatness inspection
First of all, the flatness of the ground to be paved with wood floors can be checked. 2M feet can be used to place them flat on the ground, and 3mm thick feet can be used to check the gap between the feet and the ground. If they fail, they will be qualified, and if they pass, they will be unqualified. If the ground is uneven, you need to use the blade to cut flat, serious situation to re leveling or do self leveling treatment. If the ground flatness is not up to standard and paving is carried out, the feeler gauge will cause problems such as floor edge collapse, warping, arching, noise, etc.
2. Ground moisture content inspection
Secondly, check the water content of the ground, the water content tester can be used to measure the water content of the ground, the requirements of the ordinary ground standard <20%, laying the ground floor requirements standard <10%. If the moisture content of the ground is too high, the wood floor is easy to absorb water and expand, causing the floor to arch, drum, sound and other problems, so if the moisture content of the ground exceeds the standard value, dehumidification should be carried out.
3. Check whether the ground is strong
Next, is to check whether the ground is strong, you can use the screw handle or hammer hit the ground, check whether the ground is hollow, peeling. If the ground has voids or spalling, the ground needs to be reprocessed. Otherwise, after laying the floor for a period of time, because the ground is not solid, there will be noise.
4, check whether to do a good job of waterproof measures
Then, check whether waterproof measures have been taken, because the floor is afraid of water invasion. After water invasion, the floor will blister, degumming, deformation and other series of problems, resulting in unusable floor. Therefore, it is necessary to check whether the waterproof measures are well done and whether there is water leakage in the house before paving. If so, the floor shall be paved after treatment.
5. Floor construction and other construction staggered
Finally, the construction time of wood floor is determined. Generally, the floor decoration should be staggered with other constructions. The floor paving link should be carried out after the ground concealed works, suspended ceiling works, wall works and water and electricity works are completed and accepted. Cross operation is easy to cause floor damage. For example, if the wall works are not completed, falling gravel will cause problems such as ash and scratch the floor, and paint and paint will spills on the floor to damage the floor, everything needs our attention.